CLIENT |
DESCRIPTION |
STATUS |
NAOC 4500002424/00 | Back of 2.6km trench from sabatoru River bank to Akepelai point “A” and 59 cable points along 8” pipe from Nembe south I & II to Obama flow station. |
COMPLETED |
NAOC4500004773/00 | Obuturu 2.4km 4” flowline and hook-up to Azuzuama well 4 together with well head platforms, Hook-up arms and riser fabrication and installation (abandoned by Mc Kay) | COMPLETED |
NAOC4500002928/00 | Sangana “A” 6” 4.4km flowline together with well head platform hook-up arms risers and production manifold fabrication and installations (Abandoned by Geolynx) | COMPLETED |
NAOC4500003243/00 | Construction of well head platforms and manifold for Osiama | COMPLETED |
NAOC4500005125/00 | Ogbonbiri weld 2 6” 1.2km water injections pipeline project and construction of well 10 pipe works part A. | COMPLETED |
NAOC | Ogbonbiri API pumps installation and piping systems fabrications and installations. | COMPLETED |
NAOC | Ogbonbiri Well 2 6” 1.2km water injections pipeline project and construction of well 10 pipe works Part B | COMPLETED |
NAOC | Ogbonbiri well 2 6” 1.2km water injection pipe line project and construction of well 10 pipe works Part C | COMPLETED |
NAOC | Ogbonbiri production manifold extension project | COMPLETED |
NAOC | Ogbonbiri water injection discharge header and bypass system fabrication and installations | COMPLETED |
NAOC | Azuzuama well 5 tebidaba well 14 clough creek well 5 and Nembe South II well heads dis-assembling refurbishment, modification and reassembling projects for rig work over activities. | COMPLETED |
NAOC | Extra works and supply of materials for various flow line projects | COMPLETED |
NAOC | Logistics services for Nembe South II & III. | COMPLETED |
NAOC | Clough Creek 18” trunk line major emergency leak repair/valve station platform fabrication and installation. | COMPLETED |
NAOC | Azuzuama 10” trunk line major leak repair. | COMPLETED |
NAOC | Ogoda to Brass 24” major delivery line several leak repairs. | COMPLETED |
NAOC | Tebidaba 18” trunk line several leak repairs. | COMPLETED |
SPDC | 4” 23.4KM flowline from well 14 to Nembe creek flow station SPDC together with well head platform hook-up arm risers fabrication and installation. | COMPLETED |
SPDC | Maintenance support service | COMPLETED |
SPDC | Operation support service | COMPLETED |
SOIMI NIG. LTD. | Welding and laying of 18” 7.8km flowline project (for SPDC) | COMPLETED |
ADDAX Petroleum2003/2004 | Ossu-Izombe 10”, 11km flow line project for Addax Petroleum Ltd. | COMPLETED |
DEC OIL & GAS1999/2000 | Opukushi flow Station to well 10 4” 6.5km line project (for SPDC) | COMPLETED |
LEE ENGINEERING1999/2000 | Mobil Production Facilities (MPF) for Nembe/Bassambiri flowstation fabrication and installation for SPDC Santa Babara- half of the fabrication, skids and installation. | COMPLETED |
NAOC2005 /2006 | 30” 20km – Ogboinbiri to Tebidaba Gas pipe line (swamp area) | COMPLETED |
Ministry of works & Transport Bayelsa State, 2007. Ref.MOW/AD/CON |
Construction of an Internet centre for Brass Local Government Area, Bayelsa State | COMPLETED |
Ministry of works & Transport Bayelsa State, 2007. Ref.MOW/AD/CON |
Construction of an Internet centre for Nembe Local Government Area, Bayelsa State | COMPLETED |
Sublet by Daewoo-Naoc 2006 | 30” 15km – Ob/Ob to Ogboinbiri gas pipeline (swamp area) | COMPLETED |
SPDC 2007 | 4” 500m Nembe II flow line sectional replacement | COMPLETED |
SPDC 2007 | Sectional replacement of 10” Diebu Creek line | COMPLETED |
SPDC 2007 | Sectional replacement of 10” Ekewe to Nun river flow station line. | COMPLETED |
SPDC 2007 | Replacement of 12” X 14” barrel door of Nun river flow station at Oporoma | COMPLETED |
SPDC 2007 | Leak repairs on 10”, 16” & 14” at Onyoma, Enewari, Agobiri communities | COMPLETED |
SPDC 2008 | Leak repairs on 10”, 16” & 14” at Onyoma, Enewari, Agobiri communities | COMPLETED |
SPDC 2008 | Sectional replacement of 10” Ekewe to Nun river flow station line. | COMPLETED |
SPDC 2008 | Sectional replacement of 10” Diebu Creek line. | COMPLETED |
SPDC 2008 | 16” Kolo Creek to Nun River flow station, sectional replacement at Agobiri. | COMPLETED |
SPDC 2008 | 10” Diebu to Nun River Leak repair using shoring system at Peremabiri. | COMPLETED |
SPDC 2008 | Well 11 & 12 construction and installation of well head platforms, hook-up arms, risers & 9.8km 4” flow lines. | COMPLETED |
NAOC 2007 | Ikebiri river crossing leak repair/manifold modification | COMPLETED |
NAOC 2007 | Tebidaba well 9 LS & SS replacement of vandalized flow lines | COMPLETED |
NAOC 2007 | Leak repair on 10” at Apoi | COMPLETED |
NAOC 2007 | Sectional replacement on Clough Creek-Tebidaba 6” & 10” lines at Ikeibiri 2 | COMPLETED |
NAOC 2007 | Leak repairs on 10” & 4” lines-Clough Creek Tebidaba line at Azuzuama. | COMPLETED |
NAOC 2007 | Leak repairs on 18” Tebidaba line at Obalikiri, Oyeregbene, Lasukugbene, Igbematoru, Lagosgbene M6, M8, Kalatoru & Kamboro respectively. | COMPLETED |
NAOC 2007 | Sectional replacement on 14” Ogbonbiri-Tebidaba line at – Ondewari & Krokosei | COMPLETED |
NAOC 2007 | Sectional replacement on 6” Osiama flow lines at krokosei | COMPLETED |
NAOC 2007 | Sectional replacement on 6” Ogbebiri at Krokosei | COMPLETED |
NAOC 2007 | Ogbinbiri flow station atmospheric separator and gas line repair projects | COMPLETED |
NAOC 2007 | 24” Ogoda-Brass line leak repairs at Nembe | COMPLETED |
NAOC 2007 | Sectional replacement of Tebidaba well 12 LS & SS-1.4 km-4” | COMPLETED |
NAOC 2008 | Sectional replacement of Tebidaba well 13, LS & SS-2.4 km-4” | COMPLETED |
NAOC 2008 | Sectional replacement of Tebidaba well 9, LS & SS-1.1 km-4” | COMPLETED |
NAOC 2008 | Sectional replacement of Tebidaba well 14, LS & SS-1.3 km-6” | COMPLETED |
NAOC 2008 | 18” Tebidaba-Brass line leak repairs at Igbematorou-m10 & m11 | COMPLETED |
NAOC 2008 | 18” Tebidaba-Brass line leak repairs at Oyeregbene | COMPLETED |
NAOC 2008 | 18” Tebidaba-Brass line leak repairs at Lasukugbene | COMPLETED |
NAOC 2008 | 18” Tebidaba-Brass line leak repairs at kamboro | COMPLETED |
NAOC 2008 | 18” Tebidaba-Brass line leak repairs at kalatoru | COMPLETED |
NAOC 2008 | 14” Ogbonbiri-Tebidaba line leak repairs at Ondewari | COMPLETED |
NAOC 2008 | 14” Ogbonbiri-Tebidaba line leak repairs at Krokrosei | COMPLETED |
NAOC 2008 | 14” Ogbonbiri-Tebidaba line leak repairs at Ikebiri 1 | COMPLETED |
NAOC 2008 | 14” Ogbonbiri-Tebidaba line leak repairs at Okpotowari | COMPLETED |
NAOC 2008 | 10” Clough Creek-Azuzuama line leak repairs at Ikebiri II | COMPLETED |
NAOC 2008 | 10” Clough Creek-Azuzuama line leak repairs at Azuzuama | COMPLETED |
NAOC 2008 | 10” Clough Creek-Azuzuama line leak repairs at Apoi | COMPLETED |
NAOC 2008 | 10” Clough Creek-Azuzuama line leak repairs at Gbanra | COMPLETED |
NAOC 2008 | 6” Ogbonbiri-Osiama line leak repairs at Ondewari | COMPLETED |
NAOC 2008 | 6” Ogbonbiri-Osiama line leak repairs at Krokrosei | COMPLETED |
NAOC 2008 | 6” Ogbonbiri-Osiama line leak repairs at -Kemebiama | COMPLETED |
NAOC 2008 | 6” Ogbonbiri-Osiama line leak repairs at Okpotowari | COMPLETED |
NAOC 2008 | 6” Azuzuama-Tebidaba line leak repairs at Olugbogboro | COMPLETED |
NAOC 2008 | 4” Azuzuama well 5 flow line leak repairs at Azuzuama & several leak repair project in swamp area for NAOC AREA & SPDC | COMPLETED |
NAOC 2008 | 10” Clough Creek-Tebidaba line, laying and installation. | COMPLETED |
NAOC 2008 | Lagosgbene, Egbematoru, Kalatoru, Kamboro, Onigbogboro, Okigbene etc, several leak repairs/sectional replacement. | COMPLETED |
NAOC 2008 | Construction and installation of Ogbeinbiri by-pass and associated civil works | COMPLETED |
NAOC 2008 | Several leak repair points and sectional replacement projects-Osiama 6” line, Osiama manifold riser, Tebedaba well 9,11 & 14, Lagosgbene point 1 & 2, Egbematorou M10 & M11 point 1& 2, Kalatorou point 1 & 2 etc | COMPLETED |
NAOC 2009 | Ikebiri 14” riser, 8” Sabatorou line, 6” Osiama line at Odewari | COMPLETED |
NAOC 2009 | Refurbishment and re-construction of m6 & m8 main valve platforms | COMPLETED |
NAOC 2009 | Osiama 6” x 8km pipeline | COMPLETED |
NAOC 2009 | Tebidaba to Brass 18” pipe line sectional replacement at Abalikiri | COMPLETED |
NAOC 2009 | Ogoda-Ogboinbiri 24” pipe line several leak points and sectional replacement | COMPLETED |
NAOC 2009 | Tebidaba well 14-6” sectional replacement and clamping project | COMPLETED |
NAOC 2009 | Tebidaba-Brass pipe line clamping project at Kalatorou | COMPLETED |
NAOC 2009 | Osiama-Ogboinbiri by-pass construction and associated civil job | COMPLETED |
NAOC 2009 | Several leak repairs points on Osiama 6” | COMPLETED |
NAOC 2009 | Clough Creek-Tebidaba 10” pipe line at Ikebiri 2 | COMPLETED |
NAOC 2009 | Clough Creek-Tebidaba pipe line at Azagbene | COMPLETED |
NAOC 2009 | Clough Creek-Tebidaba pipe line behind flow station | COMPLETED |
NAOC 2009 | Complete reconstruction and installation of Clough Creek production manifold/installation of gratings on plat form | COMPLETED |
NAOC 2009 | Integrity checks & replacement of flow lines on Clough Creek wells-1ss,4LS/SS,6SS, 7T, 8LS/8SS,9L & 3T construction and installation of hook-up arms together with flow lines | COMPLETED |
NAOC 2009 | Tebidaba-Brass 18” pipe line leak repair at Atiama | COMPLETED |
NAOC 2009 | Tebidaba-Brass 18” pipe line leak repair at Agriiaba | COMPLETED |
NAOC 2009 | Ogoda-Ogboinbiri 24” pipe line at Agwobiri | COMPLETED |
NAOC 2009 | Clough Creek arrival manifold reconstruction | COMPLETED |
NAOC 2009 | Integrity cheeks and Replacement of Clough Creek wells-1SS. 3T, 4LS, 4SS, 6SS, 7T, 8LS, 8SS & 9L flowline. | COMPLETED |
NAOC 2009 | Reconstruction of Clough Creek HP and atmospheric separator piping/rehabilitation of generator house shelter. | COMPLETED |
NAOC 2009 | Rehabilitation of Clough Creek API skimmer, drain system, fuel gas system, flare system and open & close drain | COMPLETED |
NAOC 2010 | Welding and installation of Clough Creek 2” diesel line & numerous miscellaneous jobs. | COMPLETED |
NAOC 2010 | Construction and connection of Clough Creek existing 12” manifold down stream of booster pump to existing 8” manifold upstream of metering skid. | COMPLETED |
NAOC 2010 | Welding and installation of Clough Creek 2” flare line to generator unit, 2” & 1” fuel line to generator, 2” air line to generator, dismantling & servicing of 6” x 900# shutdown valve and reinstallation, 4” x 3” line to skimmer unit, 4” gas flare line to 3” pilot line and cleaning of skimmer vessel internal & external and painting, installation of valves and blinds at LP & HP, welding and installation of 8” x 600# flanges and valves on Tebidaba 10” line, welding and installation of 3” & 2” piping together with 3” valves at pump area, removal and reinstallation of generator at generator shelter, removal and restallation of actuator and 12” valves at pipe rack. | COMPLETED |
NAOC 2010 | Several leak repairs ranging from 18” Tebidaba Brass line, Ogoda Ogboinbiri 24” line at Oporoma, Ogboinbiri Tebidaba 14” line at Ikebiri, Kemebiama, Osiama 6” flowline, Tebidaba wells 14 & 11 flowline replacement and several others. | COMPLETED |