CLIENT

DESCRIPTION

STATUS

NAOC 4500002424/00 Back of 2.6km trench from sabatoru River bank to Akepelai point “A”
and 59 cable points along 8” pipe from Nembe south I & II to Obama flow station.
COMPLETED
NAOC4500004773/00 Obuturu 2.4km 4” flowline and hook-up to Azuzuama well 4 together with well head platforms, Hook-up arms and riser fabrication and installation (abandoned by Mc Kay) COMPLETED
NAOC4500002928/00 Sangana “A” 6” 4.4km flowline together with well head platform hook-up arms risers and production manifold fabrication and installations (Abandoned by Geolynx) COMPLETED
NAOC4500003243/00 Construction of well head platforms and manifold for Osiama COMPLETED
NAOC4500005125/00 Ogbonbiri weld 2 6” 1.2km water injections pipeline project and construction of well 10 pipe works part A. COMPLETED
NAOC Ogbonbiri API pumps installation and piping systems fabrications and installations. COMPLETED
NAOC Ogbonbiri Well 2 6” 1.2km water injections pipeline project and construction of well 10 pipe works Part B COMPLETED
NAOC Ogbonbiri well 2 6” 1.2km water injection pipe line project and construction of well 10 pipe works Part C COMPLETED
NAOC Ogbonbiri production manifold extension project COMPLETED
NAOC Ogbonbiri water injection discharge header and bypass system fabrication and installations COMPLETED
NAOC Azuzuama well 5 tebidaba well 14 clough creek well 5 and Nembe South II well heads dis-assembling refurbishment, modification and reassembling projects for rig work over activities. COMPLETED
NAOC Extra works and supply of materials for various flow line projects COMPLETED
NAOC Logistics services for Nembe South II & III. COMPLETED
NAOC Clough Creek 18” trunk line major emergency leak repair/valve station platform fabrication and installation. COMPLETED
NAOC Azuzuama 10” trunk line major leak repair. COMPLETED
NAOC Ogoda to Brass 24” major delivery line several leak repairs. COMPLETED
NAOC Tebidaba 18” trunk line several leak repairs. COMPLETED
SPDC 4” 23.4KM flowline from well 14 to Nembe creek flow station SPDC together with well head platform hook-up arm risers fabrication and installation. COMPLETED
SPDC Maintenance support service COMPLETED
SPDC Operation support service COMPLETED
SOIMI NIG. LTD. Welding and laying of 18” 7.8km flowline project (for SPDC) COMPLETED
ADDAX Petroleum2003/2004 Ossu-Izombe 10”, 11km flow line project for Addax Petroleum Ltd. COMPLETED
DEC OIL & GAS1999/2000 Opukushi flow Station to well 10 4” 6.5km line project (for SPDC) COMPLETED
LEE ENGINEERING1999/2000 Mobil Production Facilities (MPF) for Nembe/Bassambiri flowstation fabrication and installation for SPDC Santa Babara- half of the fabrication, skids and installation. COMPLETED
NAOC2005 /2006 30” 20km – Ogboinbiri to Tebidaba Gas pipe line (swamp area) COMPLETED

Ministry of works & Transport Bayelsa State, 2007.

Ref.MOW/AD/CON

Construction of an Internet centre for Brass Local Government Area, Bayelsa State COMPLETED

Ministry of works & Transport Bayelsa State, 2007.

Ref.MOW/AD/CON

Construction of an Internet centre for Nembe Local Government Area, Bayelsa State COMPLETED
Sublet by Daewoo-Naoc 2006 30” 15km – Ob/Ob to Ogboinbiri gas pipeline (swamp area) COMPLETED
SPDC 2007 4” 500m Nembe II flow line sectional replacement COMPLETED
SPDC 2007 Sectional replacement of 10” Diebu Creek line COMPLETED
SPDC 2007 Sectional replacement of 10” Ekewe to Nun river flow station line. COMPLETED
SPDC 2007 Replacement of 12” X 14” barrel door of Nun river flow station at Oporoma COMPLETED
SPDC 2007 Leak repairs on 10”, 16” & 14” at Onyoma, Enewari, Agobiri communities COMPLETED
SPDC 2008 Leak repairs on 10”, 16” & 14” at Onyoma, Enewari, Agobiri communities COMPLETED
SPDC 2008 Sectional replacement of 10” Ekewe to Nun river flow station line. COMPLETED
SPDC 2008 Sectional replacement of 10” Diebu Creek line. COMPLETED
SPDC 2008 16” Kolo Creek to Nun River flow station, sectional replacement at Agobiri. COMPLETED
SPDC 2008 10” Diebu to Nun River Leak repair using shoring system at Peremabiri. COMPLETED
SPDC 2008 Well 11 & 12 construction and installation of well head platforms, hook-up arms, risers & 9.8km 4” flow lines. COMPLETED
NAOC 2007 Ikebiri river crossing leak repair/manifold modification COMPLETED
NAOC 2007 Tebidaba well 9 LS & SS replacement of vandalized flow lines COMPLETED
NAOC 2007 Leak repair on 10” at Apoi COMPLETED
NAOC 2007 Sectional replacement on Clough Creek-Tebidaba 6” & 10” lines at Ikeibiri 2 COMPLETED
NAOC 2007 Leak repairs on 10” & 4” lines-Clough Creek Tebidaba line at Azuzuama. COMPLETED
NAOC 2007 Leak repairs on 18” Tebidaba line at Obalikiri, Oyeregbene, Lasukugbene, Igbematoru, Lagosgbene M6, M8, Kalatoru & Kamboro respectively. COMPLETED
NAOC 2007 Sectional replacement on 14” Ogbonbiri-Tebidaba line at – Ondewari & Krokosei COMPLETED
NAOC 2007 Sectional replacement on 6” Osiama flow lines at krokosei COMPLETED
NAOC 2007 Sectional replacement on 6” Ogbebiri at Krokosei COMPLETED
NAOC 2007 Ogbinbiri flow station atmospheric separator and gas line repair projects COMPLETED
NAOC 2007 24” Ogoda-Brass line leak repairs at Nembe COMPLETED
NAOC 2007 Sectional replacement of Tebidaba well 12 LS & SS-1.4 km-4” COMPLETED
NAOC 2008 Sectional replacement of Tebidaba well 13, LS & SS-2.4 km-4” COMPLETED
NAOC 2008 Sectional replacement of Tebidaba well 9, LS & SS-1.1 km-4” COMPLETED
NAOC 2008 Sectional replacement of Tebidaba well 14, LS & SS-1.3 km-6” COMPLETED
NAOC 2008 18” Tebidaba-Brass line leak repairs at Igbematorou-m10 & m11 COMPLETED
NAOC 2008 18” Tebidaba-Brass line leak repairs at Oyeregbene COMPLETED
NAOC 2008 18” Tebidaba-Brass line leak repairs at Lasukugbene COMPLETED
NAOC 2008 18” Tebidaba-Brass line leak repairs at kamboro COMPLETED
NAOC 2008 18” Tebidaba-Brass line leak repairs at kalatoru COMPLETED
NAOC 2008 14” Ogbonbiri-Tebidaba  line leak repairs at Ondewari COMPLETED
NAOC 2008 14” Ogbonbiri-Tebidaba  line leak repairs at Krokrosei COMPLETED
NAOC 2008 14” Ogbonbiri-Tebidaba  line leak repairs at Ikebiri 1 COMPLETED
NAOC 2008 14” Ogbonbiri-Tebidaba  line leak repairs at Okpotowari COMPLETED
NAOC 2008 10” Clough Creek-Azuzuama  line leak repairs at Ikebiri II COMPLETED
NAOC 2008 10” Clough Creek-Azuzuama  line leak repairs at Azuzuama COMPLETED
NAOC 2008 10” Clough Creek-Azuzuama  line leak repairs at Apoi COMPLETED
NAOC 2008 10” Clough Creek-Azuzuama  line leak repairs at Gbanra COMPLETED
NAOC 2008 6” Ogbonbiri-Osiama  line leak repairs at Ondewari COMPLETED
NAOC 2008 6” Ogbonbiri-Osiama  line leak repairs at Krokrosei COMPLETED
NAOC 2008 6” Ogbonbiri-Osiama  line leak repairs at -Kemebiama COMPLETED
NAOC 2008 6” Ogbonbiri-Osiama  line leak repairs at Okpotowari COMPLETED
NAOC 2008 6” Azuzuama-Tebidaba  line leak repairs at Olugbogboro COMPLETED
NAOC 2008 4” Azuzuama well 5 flow  line leak repairs at Azuzuama & several leak repair project in swamp area for NAOC AREA & SPDC COMPLETED
NAOC 2008 10” Clough Creek-Tebidaba line, laying and installation. COMPLETED
NAOC 2008 Lagosgbene, Egbematoru, Kalatoru, Kamboro, Onigbogboro, Okigbene etc, several leak repairs/sectional replacement. COMPLETED
NAOC 2008 Construction and installation of Ogbeinbiri by-pass and associated civil works COMPLETED
NAOC 2008 Several leak repair points and sectional replacement projects-Osiama 6” line, Osiama manifold riser, Tebedaba well 9,11 & 14, Lagosgbene point 1 & 2, Egbematorou M10 & M11 point 1& 2, Kalatorou point 1 & 2 etc COMPLETED
NAOC 2009 Ikebiri 14” riser, 8” Sabatorou line, 6” Osiama line at Odewari COMPLETED
NAOC 2009 Refurbishment and re-construction of m6 & m8 main valve platforms COMPLETED
NAOC 2009 Osiama 6” x 8km pipeline COMPLETED
NAOC 2009 Tebidaba to Brass 18” pipe line sectional replacement at Abalikiri COMPLETED
NAOC 2009 Ogoda-Ogboinbiri 24” pipe line several leak points and sectional replacement COMPLETED
NAOC 2009 Tebidaba well 14-6” sectional replacement and clamping project COMPLETED
NAOC 2009 Tebidaba-Brass pipe line clamping project at Kalatorou COMPLETED
NAOC 2009 Osiama-Ogboinbiri by-pass construction and associated civil job COMPLETED
NAOC 2009 Several leak repairs points on Osiama 6” COMPLETED
NAOC 2009 Clough Creek-Tebidaba 10” pipe line at Ikebiri 2 COMPLETED
NAOC 2009 Clough Creek-Tebidaba pipe line at Azagbene COMPLETED
NAOC 2009 Clough Creek-Tebidaba pipe line behind flow station COMPLETED
NAOC 2009 Complete reconstruction and installation of Clough Creek production manifold/installation of gratings on plat form COMPLETED
NAOC 2009 Integrity checks & replacement of flow lines on Clough Creek wells-1ss,4LS/SS,6SS, 7T, 8LS/8SS,9L & 3T construction and installation of hook-up arms together with flow lines COMPLETED
NAOC 2009 Tebidaba-Brass 18” pipe line leak repair at Atiama COMPLETED
NAOC 2009 Tebidaba-Brass 18” pipe line leak repair at Agriiaba COMPLETED
NAOC 2009 Ogoda-Ogboinbiri 24” pipe line at Agwobiri COMPLETED
NAOC 2009 Clough Creek arrival manifold reconstruction COMPLETED
NAOC 2009 Integrity cheeks and Replacement of Clough Creek wells-1SS. 3T, 4LS, 4SS, 6SS, 7T, 8LS, 8SS & 9L flowline. COMPLETED
NAOC 2009 Reconstruction of Clough Creek HP and atmospheric separator piping/rehabilitation of generator house shelter. COMPLETED
NAOC 2009 Rehabilitation of Clough Creek API skimmer, drain system, fuel gas system, flare system and open & close drain COMPLETED
NAOC 2010 Welding and installation of Clough Creek 2” diesel line & numerous miscellaneous jobs. COMPLETED
NAOC 2010 Construction and connection of Clough Creek existing 12” manifold down stream of booster pump to existing 8” manifold upstream of metering skid. COMPLETED
NAOC 2010 Welding and installation of Clough Creek 2” flare line to generator unit, 2” & 1” fuel line to generator, 2” air line to generator, dismantling & servicing of 6” x 900# shutdown valve and reinstallation, 4” x 3” line to skimmer unit, 4” gas flare line to 3” pilot line and cleaning of skimmer vessel internal & external and painting, installation of valves and blinds at LP & HP, welding and installation of 8” x 600# flanges and valves on Tebidaba 10” line, welding and installation of 3” & 2” piping together with 3” valves at pump area, removal and reinstallation of generator at generator shelter, removal and restallation of actuator and 12” valves at pipe rack. COMPLETED
NAOC 2010 Several leak repairs ranging from 18” Tebidaba Brass line, Ogoda Ogboinbiri 24” line at Oporoma, Ogboinbiri Tebidaba 14” line at Ikebiri, Kemebiama, Osiama 6” flowline, Tebidaba wells 14 & 11 flowline replacement and several others. COMPLETED